[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: MuCap
- To: Peter Kammel <kammel@npl.uiuc.edu>
- Subject: Re: MuCap
- From: Peter Winter <peter.winter@psi.ch>
- Date: Thu, 13 Oct 2005 16:20:53 +0200
- Cc: Brendan Kiburg <kiburg@npl.uiuc.edu>, Steve Clayton <smclayto@uiuc.edu>
- In-reply-to: <Pine.LNX.4.21.0510130900440.30887-100000@one.npl.uiuc.edu>
- References: <Pine.LNX.4.21.0510130900440.30887-100000@one.npl.uiuc.edu>
- User-agent: Mozilla/5.0 (X11; U; Linux i686; en-US; rv:1.7.3) Gecko/20040913
Peter Kammel wrote:
>Dear Peter,
>
>Thanks for the info. I'll have a look at the drawings to see whether we
>can raise it. It would be some addition to the construction, because
>we don't have 6 cm travel in our adjustment bolts, I believe.
>
>Today around 10/13 10:05 both chambers hit the watchdog limit, in what
>looks like a physical runaway situation. Is there anything abnormal,
>like water or Hallendienst entry in the tent at this time? If everything
>looks ok I ramp them up again.
>
>Best regards
>
>Peter
>
>
I checked the tent in the morning (around 11 am) and saw that one part
was open. I don't think it was the Hallendienst (although it's the back
corner from where one could go to the buckets behind the barrack) but
that just the tape did not glue anymore. I fixed it with additional tape
but certainly warm, moistured air came in. Now, the tent is closed again.
Peter