[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
exhalo drawings
Dear Dave et al.,
The desired pieces are ready:
- 2 scintillators made in the East workshop. I put them
today on the table in the muLAN barrak.
- the 2 lead-through pieces for the light guides made in
the West under the supervision of Mr Ruettimann.
In these two pieces the side pumping shafts had to be
glued in and are presently drying. They are still fixed
at the workbenches of the working room of the vacuum
group (vis a vis of their offices). You can take them
tomorrow. - There is a caveat: the light guides should be
inserted from the side where the NW40 flange is, see drawing
in the muLAN Barrak.
I hope this puts you in business on the weekend!
With best regards
Claude
PS: A message for Peter: the apd board is still being tested
and will only be ready on Monday.
David W Hertzog wrote:
> Claude,
> Many thanks! I'll arrive at PSI on Saturday by the way.
>
> Best,
> Dave
>