Dear Peter.
I am sending you the final results of TPC testing under the pressure
P=10.15Bar. These data have been obtained in the second half of May 18.
After that TPC irradiated by 90Sr source under HV=6kV during two days. In
totally it means that TPC worked properly during one week under the source
current 30nA and HV=5.8kV(for P=9.7Bar) and HV=6kV (for P=10.15Bar).

I would like to point out that it necessary to perform more care TPC
investigation in the future. In a frame of this work it is necessary to
investigate the current counting rate behavior for each anode wire and
cathode strip. In addition I propose to investigate an electron efficiency
in TPC. For this  purpose I would like to organize trigger (GATE) from
that electrons which passed through TPC and to measure coincidence with
pulses from the wires that are placed closer to the entrance Be-window.

My best regards.
Anatoly



> Dear Peter.
> Below you can find a file with preliminary results of TPC testing in
> hydrogen. Unfortunately the pressure inside of vessel is go down day per
> day because of leak of the valve. For instance, today pressure is 9.58
> Bar.
>
> Please note, high voltage values indicated in figures have NOT corrected
> according to the pressure values. It means that high voltage 5.8kV will
> correspond to the HV=6.0kV under the pressure P=10Bar.
>
> To be sure that TPC has some "long time stability" (at list a few days)
> two days ago the TPC run started under HV=5.8kV with 90Sr. During this
> period pressure was changed between 9.7 and 9.6Bar. Till now TPC is
> running properly. This test will be finished by Friday - Volodja's leaving
> day.
>
> As one can see TPC can detect an electron tracks from 90Sr. Signal/noise
> ratio is more than 10.
>
> Of cause we have some quite serious questions for the long term stability
> TPC and would like to improve it. More detail report we will send you
> late.
>
> My best regards.
> Anatoly
>
>
>
>
>
>
>
>
>