[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Gatchina proceedings



Dear Peter.
Below you can find a file with preliminary results of TPC testing in
hydrogen. Unfortunately the pressure inside of vessel is go down day per
day because of leak of the valve. For instance, today pressure is 9.58
Bar.

Please note, high voltage values indicated in figures have NOT corrected
according to the pressure values. It means that high voltage 5.8kV will
correspond to the HV=6.0kV under the pressure P=10Bar.

To be sure that TPC has some "long time stability" (at list a few days)
two days ago the TPC run started under HV=5.8kV with 90Sr. During this
period pressure was changed between 9.7 and 9.6Bar. Till now TPC is
running properly. This test will be finished by Friday - Volodja's leaving
day.

As one can see TPC can detect an electron tracks from 90Sr. Signal/noise
ratio is more than 10.

Of cause we have some quite serious questions for the long term stability
TPC and would like to improve it. More detail report we will send you
late.

My best regards.
Anatoly








Attachment: TPC-report_140505
Description: Binary data