| MuCap Run11 |
|
|
Name |
Start |
End |
Milestone |
Progress |
Assign To |
Edit Notes... |
| beam time | 8/1/07 | 10/29/07 | 0 | |||
| measurements | 8/1/07 | 10/29/07 | 0 | |||
| setup in piE3 | 8/16/07 | 8/22/07 | 0 | |||
| det/daq setup | 8/16/07 | 8/20/07 | 0 | |||
| beam tuning | 8/18/07 | 8/20/07 | 0 | |||
| TPC setup | 8/17/07 | 8/22/07 | 0 | |||
| CHUPS setup | 8/16/07 | 8/18/07 | 0 | |||
| production | 8/20/07 | 10/17/07 | 0 | |||
| mu+ | 8/22/07 | 10/13/07 | 0 | |||
| 1 | 8/22/07 | 8/27/07 | 0 | |||
| 2 | 9/25/07 | 10/13/07 | 0 | |||
| mu- | 8/31/07 | 10/17/07 | 0 | |||
| 1 | 8/31/07 | 9/25/07 | 0 | |||
| 2 | 10/13/07 | 10/17/07 | 0 | |||
| AK3 | 8/20/07 | 8/22/07 | 0 | |||
| systematics | 8/1/07 | 10/29/07 | 0 | |||
| H2O/mu+ | 10/23/07 | 10/29/07 | 0 | |||
| Ar/mu+ | 10/17/07 | 10/23/07 | 0 | |||
| accidentals | 8/1/07 | 8/2/07 | 0 | |||
| no beam | 8/27/07 | 10/12/07 | 0 | |||
| 1 | 8/27/07 | 8/31/07 | 0 | |||
| 2 | 9/17/07 | 9/20/07 | 0 | |||
| 3 | 10/8/07 | 10/12/07 | 0 | |||
| detectors | 8/1/07 | 8/3/07 | 0 | |||
| survey | 8/1/07 | 8/2/07 | 0 | |||
| survey? | 8/1/07 | 8/2/07 | 0 | PW | ||
| mPC alignment | 8/1/07 | 8/2/07 | 0 | PK | ||
| TPC | 8/1/07 | 8/3/07 | 0 | |||
| prep and operation | 8/1/07 | 8/2/07 | 0 | CP, MH | ||
| electronics noise | 8/2/07 | 8/3/07 | 0 | GP | ||
| mDet | 8/1/07 | 8/3/07 | 0 | |||
| mSC+beam | 8/2/07 | 8/3/07 | 0 | BK, PW | ||
| mPC | 8/1/07 | 8/2/07 | 0 | SK, PK | ||
| eSC | 8/1/07 | 8/2/07 | 0 | |||
| check | 8/1/07 | 8/2/07 | 0 | BK, PW | ||
| optimize thresholds | 8/1/07 | 8/2/07 | 0 | BK | ||
| ePC | 8/1/07 | 8/2/07 | 0 | |||
| start HV ramping | 8/1/07 | 8/2/07 | 0 | PW, PK | ||
| fix electronics, wires | 8/1/07 | 8/2/07 | 0 | PW, PK | ||
| optimal threshold, eff, HV | 8/1/07 | 8/2/07 | 0 | BK | ||
| nDet | 8/1/07 | 8/2/07 | 0 | |||
| check | 8/1/07 | 8/2/07 | 0 | SK, PW | ||
| Gas system | 8/1/07 | 8/2/07 | 0 | |||
| H2O calibrator | 8/1/07 | 8/2/07 | 0 | CHUPS | ||
| CHUPS+TPC test | 8/1/07 | 8/2/07 | 0 | CHUPS | ||
| magnet | 8/1/07 | 8/2/07 | 0 | |||
| mount and check | 8/1/07 | 8/2/07 | 0 | BL | ||
| daq+electronics | 8/1/07 | 8/2/07 | 0 | |||
| install WFD | 8/1/07 | 8/2/07 | 0 | VT, KL | ||
| neutron FADC | 8/1/07 | 8/2/07 | 0 | FG, SK, PW | ||
| TPC FADC | 8/1/07 | 8/2/07 | 0 | FG, PW | ||
| TPC trigger | 8/1/07 | 8/2/07 | 0 | PK | ||
| big cats | 8/1/07 | 8/2/07 | 0 | VT, BK | ||
| AK3 | 8/1/07 | 8/2/07 | 0 | |||
| prepare target | 8/1/07 | 8/2/07 | 0 | BK | ||
| plan setup | 8/1/07 | 8/2/07 | 0 | BK, FG | ||
| slow control | 8/1/07 | 8/2/07 | 0 | |||
| mount, improve | 8/1/07 | 8/2/07 | 0 | BL | ||
| analysis | 8/1/07 | 8/2/07 | 0 | |||
| online | 8/1/07 | 8/2/07 | 0 | |||
| online spectra | 8/1/07 | 8/2/07 | 0 | VT, KL, PW | ||
| trend plots | 8/1/07 | 8/2/07 | 0 | KL, PW | ||
| document | 8/1/07 | 8/2/07 | 0 | |||
| offline | 8/1/07 | 8/2/07 | 0 | |||
| big cats | 8/1/07 | 8/2/07 | 0 | BK | ||
| WFDscope | 8/1/07 | 8/2/07 | 0 | VT, KL |
| Ganttproject (2.0.4) | ganttproject.org
8/8/07 - 12:00:00 AM |