[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: File number for MuCap



Dear Larry,

I checked at the office. The internal MuCap number
is 37, not 39. Please use 37.

As regards the connection between eDet and platform, it
might be an advantage to bolt things together during transport
and during craning into the experimental hall. Could you
forsee such bolts, which we would take off when using
your adjustment system, to align the eDet.
In the same spirit a bolted connection between upper and
lower ring should be included, as discussed yesterday.

Finally, we agreed on 4 crane points on the platform truss.

Once you are done, please post the latest piece of art on
your ftp site.

With best regards

Peter