[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: Final file up...
Dear Larry and Rick,
I received your message and downloaded your latest version.
Congratulations, you did an impressive and careful job. It must
have been a lot of hard work and pressure to finish that.
There is a certain beauty in these 3-d drawings, one can really
navigate around in this virtual reality. I even showed it to
my family, it is a great tool to explain what we are doing and
to make people appreciate the engineering challenges.
On the more practical side, thus far I found only minor corrections.
After our Monday discussion I will summarize our joint comments
and then we are ready for detailing.
With my best regards
Peter
On Sat, 17 Aug 2002, Larry Bartoszek wrote:
> Dear Peter,
>
> I logged in by phone, so I'm sure you'll get this. In my anonymous
> ftp site (ftp.bartoszekeng.com/pub/mucap )I have uploaded a new zip file
> called "newdetsup.zip" This has a single file that replaces
> detector_supoort_assy. The alignment mechanism is finished now.
> Assuming you like it, I would say the model is ready for detailing. Let
> me know what you think. I think I'll take the rest of the weekend off!
>
> Ciao,
> Larry
>
> Bartoszek Engineering-- www.bartoszekeng.com
>