[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: data, shipping





Hi all,


I just have a few points presently:


1) run9 data - all files which were not copied to the archive
should be transfered there before the LTOs are shipped to UIUC


2) the roof of the tent should be closed (if this is not yet done)
at winter times I think we can leave the air conditioning off
as long as all electronics and detectors are off

- do we have to give the large white aircon back ?


3) last year we left the electronics in the barack running
with some pulser signal inputs for the DAQ
- pulsers to the CAENS and TDC400's

Fred, should something similar be set up this year ?

4) Fred, do you want to have the new FADCs setup shipped
back to Berkeley ?

the box with the second card I left on dolphin together with
the serial cable connected, the first card is on top of
the TDC400 crate


5) Check the setup to keep the ePCs bubbling.




		Happy new Year

			Bernhard




*******************************************************************
Bernhard Lauss                 E-Mail: lauss@socrates.berkeley.edu
Physics Department
366 LeConte Hall
University of California @ Berkeley
Berkeley, CA 94720                             Tel: (510)-642 4057
United States                                  Fax: (510)-642 9811
*******************************************************************