[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: FADC progress



> It is exact, one zero stayed in the keyboard. The expense is 
> effectively about 10000 EUR.
> I have money provided for that. The only thing was to be sure that we 
> are going on the right track.
> If one waits to test the 8 channels prototype, it sends us very late on 
> November. Then the chance to be delivered by MAXIMS components before 
> January becomes very weak.
> On the other end, the two 2 channels prototype boards can be used to 
> confirm the method for neutrons and the benefits for the TPC by looking 
> at one or two TPC channels. Can this be done sooner? Before your 
> departure?
> Then I will wait before ordering the  ADCs

Hi, Rene,

I now have my one-channel board working in a self-triggered mode (i.e. sending a data
packet when the signal goes over a threshold) connected to one of the DEMON detectors and 
reading out cosmic ray pulses.  I've attached one to this message.  Francoise has obtained 
a 20000 neutron/second Am-Be source, and I am trying to determine how to mount it correctly 
in the detector.

Claude just gave me the second FADC board, which he received from you today.  I loaded 
in my current firmware, but it does not immediately work.  I will have to spend some time 
troubleshooting it.  I have arranged to meet Malte tomorrow afternoon to try to record some 
signals from the TPC.  If I can make your second board work properly, then I will try to
use both the Lemo and the two-pin input connectors so that we can compare the signal 
properties.  

In summary, I think there is a very good chance that we will have data to evaluate the 
performance of the board within a few days.  I will keep you up to date on our progress.

Thanks,

-- Fred

-- Fred Gray / Visiting Postdoctoral Researcher                 --
-- Department of Physics / University of California, Berkeley   --
-- fegray@berkeley.edu / phone 510-642-2438 / fax 510-642-9811  --

Attachment: demon_cosmic.pdf
Description: Adobe PDF document