Thanks for your summary. I talked with Claude today and could call
you at a suitable time tomorrow. Within 5-7 PM your time would be fine
with me. Please suggest a time.

Ad 1. We managed to accelerate the ePC2 ring production at the company by
2 weeks. So Andreev and Fetisov should come already around April 24. 

We should also discuss 
 the Be window plans
 potential Kentucky contributions to the gas system tomorrow. 
 A colleague mentioned to me that one could use a zeolite trap as an oil
 free forepump, I don't know how realistic that is.

With best regards

Peter

On Mon, 17 Mar 2003, Alexei Vorobyev wrote:

> Dear Peter,
> Unfortunately, I shall be outside of CERN tomorrow afternoon.
> So please call me on Wednesday (after fixing time by mail).
> For the beginning, I shall try to summarize the status and plans at PNPI.
> 
> 1. ePC.
>     We are prepared to send two people  (  Andreev and  Fetisov ) for two
> months,
>      as we agreed before.In addition, Anatoly Krivshich will come for a
> couple of weeks.
>      Taking into account the 5 weeks delay ,the starting date might be May10
> (please confirm)
> 
> 2. New TPC
>    The plan is to have the new TPC by the August run.
>    This is a very difficult task but I hope we shall manage with the help of
> our colleagues.
>     .
> 
> 3.  Gas circulation system
>       We expect it to be constructed in May /June and  will be under tests
> since July.
>        In our opinion, we shall not use it in the August run . One reason is
> the limitations
>        in our visiting budget. So it would be better to perform the complete
> tests of this system
>        at PNPI  till the end of this year.
> 
> 4   Participation in the May run.
>      At least, Gena Petrov will be at PSI  in May-June (He will help also
> with ePC)
>      Maybe one one of our physicists  will come as well  (question of money)
> 
> 5.  Participation in the August run
>      We plan to concentrate on this run spending most of our  resources
>       Seven persons for about two months ( Gest house and tickets being
> provided by PSI)
> 
> 6. Depleted protium.
>     This work has been started, One column was put into operation.
>     First it was flushed for several days. Then it was operated in a regular
> way during
>     only five days  and produced 9 liters of the 30 ppm protium water.
>     Then it was refilled with  fresh water and put into operation for longer
> period (10-15 days)
>     We shall see soon the results.  Meanwhile they will try to improve the
> sensitivity of the
>    measuring device to - 1ppm level (10 ppm at present).
>     At least,one thing is clear already: we shall have enough depleted
> protium for tests of the circulation
>     system  in May.  But  the work will be continued according to the plans
> I have described before
>     with the hope to produce the 1 ppm protium water and then to use it in
> the new column
>      (H2O (water)-H2 gas exchange) to  reach 0.3 ppm gas in our TPC.
>      In an optimistic scenario, this might happen by the end of this year.
> 
> 7. Complete tests of the fully equipped TPC/gas circulation/protium
> depletion /gas analysis systems
>      We would like to perform such tests at PNPI starting in the beginning
> of the next year.
>      For that we shall need an oil-free pumping system. The most expensive
> is the fore-vacuum pump.
>      We are investigating various possibilities to  get such system.
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> 
> ----- Original Message -----
> From: "Peter Kammel" <kammel@npl.uiuc.edu>
> To: "Alexei Vorobyev" <Alexei.Vorobiev@cern.ch>
> Cc: "Claude Petitjean" <claude.petitjean@psi.ch>
> Sent: Monday, March 17, 2003 3:54 PM
> Subject: Re: telephone call
> 
> 
> > Dear Alexei,
> >
> > Unfortunately I cannot make it today, because of several meetings.
> > I have asked Claude, whether he has a simple and inexpensive
> > way to get a tel number, which we can all call tomorrow. If not
> > I will call you directly at CERN.
> >
> > Also I hope to have a better estimate of the ePC schedule by tomorrow.
> >
> > Talk to you soon.
> >
> > Peter
> >
> > On Mon, 17 Mar 2003, Alexei Vorobyev wrote:
> >
> > > Dear Peter and Claude
> > > I am at CERN now. I would suggest Peter to call me  to 767 9052
> > > for example today at 6 pm Geneve time.
> > > Then we shall decide if we need the audioconference (more expensive)
> > >                                     With best regards   Alexey
> > >
> >
> >
> >
> 

Peter Kammel  /  pkammel@uiuc.edu
Department of Physics, Loomis Laboratory
University of Illinois at Urbana-Champaign
1110 West Green Street, Urbana, IL 61801 
Tel (217) 333-5424 / Fax (217) 333-1215