µLan Photo Tour

Summer 2007 Data TakingSummer 2007 Data Taking.
Assembly of the µLan ball at PSI and first data taking Assembly of the µLan ball at PSI and first data taking (fall 2003)
Preparation in Illinois and first assembly of the complete µLan ball (summer/fall 2003) Preparation in Illinois and first assembly of the complete µLan ball
Beam preparations and kicker commisioning at PSI Beam preparations and kicker commisioning (summer 2003)
Detector characterisation and testing (spring 2003) Detector production and testing
Trial run with proto-type detectors and beam commisioning Trial run with proto-type detectors and beam commisioning (summer 2003)
Production of proto-type detectors (June 2002) Production of proto-type detectors
First all-collaboration meeting First all-collaboration meeting (May 2002)
winter2001
NSFproposal