µLan Photo Tour
Summer 2007 Data Taking.
Assembly of the µLan ball at PSI and first data taking
Preparation in Illinois and first assembly of the complete µLan ball
Beam preparations and kicker commisioning at PSI
Detector production and testing
Trial run with proto-type detectors and beam commisioning
Production of proto-type detectors
First all-collaboration meeting
winter2001
NSFproposal