mup plans -------------------------------------------------------------- A. Short range 1. Chambers after run. - Chamber remains at PSI? install oilfree forepump, pumping starts in Jan turn on HV 2 weeks before March run - Gatchina/PSI prepares pad TPC for second part of March run? request 4 weeks for March run 2 weeks exsting system 1 week replace TPC MWPC with pad TPD 1 week test run with pad tpc - Gatchina: window destruction test after window floppping - Gatchina: electronics improvement - Gatchina: modify HV connector so that chamber comes closer to target - Gas system: prepare clean protium filling - Berkeley preparation for March run - prepare electronics shipping to LBNL - 2 ram readout - event filters - CAEN tdc - data analysis - combined FADC/TDC runs - PSI preparation for March run - debug TDC 400 (Tom prepares test set-up) - upgrade PC's to new Linux - debug network transfer - (Calvin & Hobbes on PPC?) -------------------------------------------------------------- B. Medium range for following run prepare at least: - final material choice for TPC - final material choice PC (prototype), kovar ... - continuous gas cleaning system - FINAL DETECTOR CONCEPT: how many pc's in primary volume? Berkeley data analysis and GEANT study - FINAL DETECTORS all final chambers backable ! - final tpc PAD tpc at PSI with longer term stays of Russian experts? - final pc's Gatchina ceramic chambers? PSI welding of frames - external scintillators - FINAL PRESSURE VESSEL electropolished.... sected feedthroughs machined at PSI? - GAS PURITY DIAGNOSTICS Gatchina experts - GAS PURIFICATION SYSTEM Gatchina, PSI, Fribourg - FINAL DAQ extensive tests of CAEN TDC's at Berkeley multicrate system (2 9U VME crates to achieve speed) FADC for whole chamber in special trigger mode?, FPGA - TDC pulse shaping: LOUVAIN digital processing? --------------------------------------------------------------