Hi Larry,
Here is what I got. There are 4 vertical poles welded onto
the platform. We can cut them off if they are in the way.
As regards the rails, I did not get satifactory answer from
PSI. I suggest that we prepare our own rails (please specify)
and define the interface to PSI as the top of the platform, i.e.
300 mm. As mentioned before the iron plate sits on heavy feet
which can be height adjusted with a wrench.
Regards
Peter
area: 2005 x 1000 mm2
height of the iron plate (top): 300 mm
thickness of the plate: 25 mm
dimension of the 4 poles: diam. = 40 mm, height 1750 mm above
the platform (with rings on top to be hooked on the crane),
the poles are welded on the platform, 100 mm inside the edges.
The beam height ist 1495 +- 5 mm.