[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
MuCap
Hi Larry,
I called you a few times, with not much success.
If you have time please call me. BTW my home tel
is (217) 351 0680.
The news from PSI are the following: They are totally
overloaded with other aspects of the experiment and
won't be able to build the platform and change their
TPC gantry this year.
However, we do have a platform at PSI from our previous
experiment. It is a iron plate (1m x 2m) resting on
3 leveling feet. PSI could weld on 4 leveling feet.
Our idea is to leave the TPC rails mounted on the floor
for the time being and mount the e-det rails onto the
smaller platform. Eventually everything could be combined
on a common platform next year. Seems like a reasonable
solution to me.
On Monday I will get the exact height, thickness and dimensions
of the platform.
John has finished MuCap6.dwg yesterday, we will check it today
and then sent it to you.
So if you don't have objections, we could go from there on Monday.
With best regards
Peter
Peter Kammel / pkammel@uiuc.edu
Department of Physics, Loomis Laboratory
University of Illinois at Urbana-Champaign
1110 West Green Street, Urbana, IL 61801
Tel (217) 333-5424 / Fax (217) 333-1215