Re: Plans_2007



Dear Sasha,

during the "unblinding" meetings, 2.5 weeks ago in Urbana, the mucap 
collaboration agreed
that another experimental run of similar size as run10 (~10 weeks) 
should be performed,
not earlier than fall 2007. The exact dates will be fixed in February 
2007 at the PSI users
meeting. I informed today Alexei, and he agreed to plan visits in 2007 
to PSI of the
same magnitude as in 2006.

Although we will run at least half the time with mu+, it is important to 
achieve again
highest gas purity using the CHUPS system. Independently, the isotope 
separation system
should be used to find out how much residual deuterium we had in the 
2006 protium.

Conc. humidity calibrations, we did not come clear yet, what should be done.

In conclusion, I can state that the CHUPS system as well as the isotope 
separator
will be needed somtimes next fall. We hope that you can enter our plans 
into your
preliminary planning.

With best regards, yours

Claude


Alexander Vasilyev wrote:

> Dear Colleagues,
>
> I have to make some planning on 2007 
> (oficialy before the end of October). If you have interest in our activity, inform me, please.
> It is not a "presise" information, it is ONLY "letter of intend". We 
> can correct later as we want, but I have to inform about it our 
> administration.
>
> With best regards   Sasha.
>
> -- 
> Vasilyev Alexander
>
> Petersburg Nuclear Physics Institute,
> Laboratory of Cryogenic and Superconductive Technique.