[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: mucap 2006
- To: Alexander Vasilyev <vassilie@mail.pnpi.spb.ru>
- Subject: Re: mucap 2006
- From: Claude Petitjean <claude.petitjean@psi.ch>
- Date: Thu, 24 Aug 2006 11:17:23 +0200
- Cc: Peter Kammel <kammel@npl.uiuc.edu>
- In-reply-to: <28832c460608240041w2b4817c8y30cf9afc18c215d7@mail.gmail.com>
- Organization: psi
- References: <44EC2948.6020604@psi.ch> <28832c460608240041w2b4817c8y30cf9afc18c215d7@mail.gmail.com>
- User-agent: Mozilla/5.0 (Windows; U; Windows NT 5.1; en-US; rv:1.6) Gecko/20040113
Dear Sasha,
thanks for your detailed information. It's exactly what I wanted to know.
In a next step I will discuss matters with Peter K. and then inform you
about our
intentions.
Basically, I see no problem to prepare the desired vacuum equipment at PSI.
With best regards
Claude
Alexander Vasilyev wrote:
> Dear Claude,
>
>
> I am in Juelich now and we are working with VASA and "polarazed
> molecular hydrogen". So, we have intensive summer time.
>
> We formulated two tasks for finalizing of the job:
> 1. Measurements (or definition of the upper limit) of the deuterium in
> the TPC;
> 2. Absolute calibration of the humidity sensor.
>
> I will try to estimate very roughly manpower and expenses of both tasks.
>
> 1st task.
> To start separator operation we need 4 people (Marat, Peter, Oleg
> Fedorchenko and me). Everything for this job is ready. I can say that
> 10 days in PSI is sufficient for this job.
> 2nd task.
> I changed my original opinion to use cryo generator for this task.
> Liquid nitrogen is absolutely sufficient. So, we are not going to
> disassemble separator. The best way will be if you will find in PSI
> ANY vacuum chamber with upper flange ISO K 100 or ISO K 160 or ISO K
> 200 and the height more then 500 mm for temporary using. Vacuum has to
> be 10-3 - 10-4. In Gatchina we will produce on the flange liquid
> nitrogen volume, Xe volume, condenser and termolizer with long tube
> for the humidity normalization. The price of this job is about 1500 Euro.
> In addition we need pressure sensor (as good as possible 1000-1500
> Eur) and calibrated (?) PT100 300-400 Euro.
> If will be impossible to find vacuum volume in PSI we can produce it
> but transportation in this case has to be done in an official way.
> For the calibration we need about two weeks (Marat, Peter and me).
>
> Conclusion:
> 1. For these two jobs we need 3 weeks in PSI for Marat, Peter and me
> (perhaps 4 in case of problems) and 2 weeks for Oleg Fedorchenko.
> 2. We need about 1500 Eur in PNPI for the production (Vorobyev?).
> 3. We need about 2000 Eur for the sensors and components in PSI.
>
> The preferable time is March-April, June, October. But we do not have
> now fixed dates, so, everything can be changed.
>
> Practical steps.
> If we basically will accept the jobs I will prepare for you
> transparences with planning and technical details for collaboration
> meeting.
>
> With best regards Sasha.
>
> --
> Vasilyev Alexander
>
> Petersburg Nuclear Physics Institute,
> Laboratory of Cryogenic and Superconductive Technique.