[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

End of run



Title: End of run

Since I want to shut down dolphin and so far the elog entry has not been updated on our mirror on the berkeley site, I just forward you the notes from our shutdown procedure. If we were missing something, please write me and Malte an email. Malte might be in during Christmas and New Year and I'll be back on Jan 03.

============================================================================

In order to stop the run and prepare for the shutdown we did several things:

- Malte took another gas sample from the TPC in case we want to analyze
  the Argon concentration later

- he will switch off everything connected with the gas system for the TPC
  and CHUPS after Christmas

- beamline magnets were turned off by the local staff

- kicker and separator are off

- muSR magnet and its water pump are off

- status of the LazyLoggers:
  run #28093 and #28094 are not yet copied at all, run #28092 is by accident
  twice on tape #53
  +lazy robot: last copied run is #28092
  +lazy rArchivFTP: last copied run is #28092

- all tapes were removed from the tape drive and put to boxes on the shelf.
  Those with data were write protected

- all computers (bears, snake, cheetah, dolphin) shut down

- all electric devices (crates, power supplies etc.) in the area and the
  barrack switched off

- A/C unit in the area switched off and closed the roof of the tent

- cabinets outside closed (besides two MuLan cabinets without key in the
  key box)

- A/C and light off

Merry Christmas and see you back in 2006 for RUN 10 !!