[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Thought about systematics
Hi guys,
Sorry but my browser and sys admin were complaining about my message.
Therefore, I don't know if some of you recieved it or not. In any
case, here it is (again for some, sorry).
Francoise
Hi guys,
I had some thought about some systematics measurements which could be
done for the end of the run. Mine is related to the kicker flat top
circuit.
As all of you know, we have to make a new measurement, before Peter
leaves, about the flatness of the circuit. However, this is still an
open question to know the exact influence of this flatness on the data.
How long would we need to run WITHOUT the circuit, to be able to measure
some variation and compare the measurements with the real data? Because,
I believe, we could run without the 8 cards for a while and measure
something.
Another subject which has retain my attention. You want to remove the
detector and install it again downstairs, to be able to perform some
measurements. In this case, Peter should inform the Hallendienst about
it, such as space will be allocated for you. I believe that we should
try to have the barrack setup where it was before and not replacing the
mucap one. We have a better access.
Last but not least, I inform you that I could be at PSI on Wednesday Oct
26 if necessary. It is a holiday here and I could fly in the night
before and leave at the end of the day.
best regards
Francoise