[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

e-detectors



Dear Peter,

Since this morning, the ePC and 1/2 eSC are under an
air-conditionned tent. I am using the space between the
barrack and the small crane rails. The airconditionner is on
and working.
Mr Stanek, who is responsible for it, was a little bit
surprized by the length of time we do need the apparatus. He
is really suggesting (requesting) that we buy our own one
for the future.

Best regards

Francoise